Frequent Questions

How do LT2 systems submit Grandfather Data?

LT2 requires that systems submit grandfather data to the State or EPA for review (141.707(f)(2)). Currently, the DCTS does not allow LT2 Schedule 1 systems to edit/alter any of the data submitted/ uploaded into the DCTS as of July 2006, including uploading grandfather data. LT2 requires that Schedule 1 systems submit grandfather data by December 1, 2006. These systems can submit the grandfather data by mailing/faxing it to the IPMC or e-mailing it to the Stage 2 inbox. Schedule 1 systems can submit GF data in the following formats:  MS excel (.xls), MS word (.doc), XML (.xml), or other commonly availble formats. LT2 Schedule 2, 3, and 4 systems will be able to upload grandfather data via the DCTS prior to their corresponding schedule regulatory due date for submitting Source Water Monitoring plans and Intents to Grandfather or Provide Full Treatment (e.g. January 1, 2007 for systems on Schedule 2).  After those deadlines, LT2 Schedule 2, 3, and 4 systems will not be able to upload data through the DCTS, but they can submit the grandfather data by mailing/faxing it to the IPMC or emailing it to the Stage 2 inbox.

Have more questions? Submit a request