If a system is required to take 8 high TTHM samples, can all 8 samples be taken at the same location?

No, the monitoring plan must identify 8 different sites with the 8 highest historical TTHM levels. These sites also must not be the same location as where the system currently takes their required Stage 1 DBPR TTHM/HAA5 samples.

For additional guidance on the Stage 2 Disinfectants and Disinfection Byproducts rule please visit http://water.epa.gov/lawsregs/rulesregs/sdwa/stage2/regulations.cfm.