Depending on timing, a system may be able to rejoin its original IDSE monitoring schedule. If this is not possible, the primacy agency will work with the system to develop a schedule that is appropriate.
For additional guidance on the Stage 2 Disinfectants and Disinfection Byproducts rule please visit http://water.epa.gov/lawsregs/rulesregs/sdwa/stage2/regulations.cfm.